Metal deck flute closure

$5.60 / LF

SS-D3-008 · MasterFormat 05 31 00 · LF

What’s in this rate

This unit covers Metal deck flute closure, measured per linear foot. The ironworker installs light-gauge flute or end closures at metal deck edges, walls, and changes of direction. The rate covers the listed material, 5.00% material waste, labor, and small tools. Pour stop, sidelap fasten, deck SF installs, and roofing closures are separate units.

Includes

  • metal flute / end closure strip
  • fasteners
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • metal-deck-pour-stop / metal-deck-sidelap-fasten
  • metal deck SF installs
  • standing-seam-*-closure (roofing)
  • brick-closure (masonry)
  • firestopping
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.05 hr × $58.00 wage and burden
$2.90
Material and small tools
$1.73
Direct rate (labor, material, and tools)
$4.63 / LF
Overhead 10% of direct
$0.46
Fee 10% of (direct and overhead)
$0.51
Loaded rate
$5.60 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.