Metal deck flute closure
$5.60 / LF
SS-D3-008 · MasterFormat 05 31 00 · LF
What’s in this rate
This unit covers Metal deck flute closure, measured per linear foot. The ironworker installs light-gauge flute or end closures at metal deck edges, walls, and changes of direction. The rate covers the listed material, 5.00% material waste, labor, and small tools. Pour stop, sidelap fasten, deck SF installs, and roofing closures are separate units.
Includes
- metal flute / end closure strip
- fasteners
- layout and installation described above
- stated material waste and small tools
Excludes
- metal-deck-pour-stop / metal-deck-sidelap-fasten
- metal deck SF installs
- standing-seam-*-closure (roofing)
- brick-closure (masonry)
- firestopping
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.05 hr × $58.00 wage and burden
- $2.90
- Material and small tools
- $1.73
- Direct rate (labor, material, and tools)
- $4.63 / LF
- Overhead 10% of direct
- $0.46
- Fee 10% of (direct and overhead)
- $0.51
- Loaded rate
- $5.60 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
