Metal deck pour stop
$13.84 / LF
SS-028 · MasterFormat 05 31 00 · LF
What’s in this rate
This unit covers Metal deck pour stop, measured per linear foot. The ironworker installs pour stop or edge closure at the metal deck perimeter. The rate covers the listed material, 5.00% material waste, labor, and small tools. Metal deck SF installs and sidelap fasten are separate units.
Includes
- pour stop / edge closure material
- fasteners
- layout and installation described above
- stated material waste and small tools
Excludes
- metal deck SF installs
- metal-deck-sidelap-fasten
- concrete edge form (CIP)
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.12 hr × $58.00 wage and burden
- $6.96
- Material and small tools
- $4.48
- Direct rate (labor, material, and tools)
- $11.44 / LF
- Overhead 10% of direct
- $1.14
- Fee 10% of (direct and overhead)
- $1.26
- Loaded rate
- $13.84 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
