Metal deck cellular

$7.00 / SF

SS-027 · MasterFormat 05 31 00 · SF

What’s in this rate

This unit covers Metal deck cellular, measured per square foot. The ironworker places and fastens cellular metal floor or roof deck. The rate covers the listed material, 5.00% material waste, labor, and small tools. Standard B/N/composite decks, pour stop, and sidelap are separate units.

Includes

  • cellular metal deck
  • fastener share
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • metal-deck-roof-15-b / floor-2-composite / roof-3-n
  • metal-deck-pour-stop / sidelap-fasten
  • shear-stud-weld
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.03 hr × $58.00 wage and burden
$1.74
Material and small tools
$4.04
Direct rate (labor, material, and tools)
$5.78 / SF
Overhead 10% of direct
$0.58
Fee 10% of (direct and overhead)
$0.64
Loaded rate
$7.00 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.