Metal deck opening reinforcement
$94.28 / EA
SS-D1-016 · MasterFormat 05 31 00 · EA
What’s in this rate
This unit covers Metal deck opening reinforcement, measured per each. The ironworker frames and fastens angle reinforcement around a cut opening in metal deck. The rate covers the listed material, 5.00% material waste, labor, and small tools. Metal deck SF installs, opening layout/cutting by trades, and structural framing at large openings are separate units.
Includes
- opening reinforcement angles / frame
- weld / fastener consumables
- layout and installation described above
- stated material waste and small tools
Excludes
- metal deck SF installs
- structural framing for large openings (beams/channels)
- MEP penetrations / firestopping
- roof curb / sump pan
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.9 hr × $58.00 wage and burden
- $52.20
- Material and small tools
- $25.72
- Direct rate (labor, material, and tools)
- $77.92 / EA
- Overhead 10% of direct
- $7.79
- Fee 10% of (direct and overhead)
- $8.57
- Loaded rate
- $94.28 / EA
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
