Metal deck opening reinforcement

$94.28 / EA

SS-D1-016 · MasterFormat 05 31 00 · EA

What’s in this rate

This unit covers Metal deck opening reinforcement, measured per each. The ironworker frames and fastens angle reinforcement around a cut opening in metal deck. The rate covers the listed material, 5.00% material waste, labor, and small tools. Metal deck SF installs, opening layout/cutting by trades, and structural framing at large openings are separate units.

Includes

  • opening reinforcement angles / frame
  • weld / fastener consumables
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • metal deck SF installs
  • structural framing for large openings (beams/channels)
  • MEP penetrations / firestopping
  • roof curb / sump pan
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.9 hr × $58.00 wage and burden
$52.20
Material and small tools
$25.72
Direct rate (labor, material, and tools)
$77.92 / EA
Overhead 10% of direct
$7.79
Fee 10% of (direct and overhead)
$8.57
Loaded rate
$94.28 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.