Metal form deck non-composite
$3.03 / SF
SS-D1-015 · MasterFormat 05 31 00 · SF
What’s in this rate
This unit covers Metal form deck non-composite, measured per square foot. The ironworker places and fastens non-composite metal form deck as a permanent form for concrete fill. The rate covers the listed material, 5.00% material waste, labor, and small tools. Composite floor deck, roof deck, pour stop, and slab concrete are separate units.
Includes
- non-composite metal form deck
- fastener share
- layout and installation described above
- stated material waste and small tools
Excludes
- metal-deck-floor-*-composite
- metal-deck-roof-*
- metal-deck-pour-stop
- concrete fill / concrete-metal-pan-deck-fill
- stair pan fill (concrete-stair-pan-fill)
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.016 hr × $58.00 wage and burden
- $0.93
- Material and small tools
- $1.57
- Direct rate (labor, material, and tools)
- $2.50 / SF
- Overhead 10% of direct
- $0.25
- Fee 10% of (direct and overhead)
- $0.28
- Loaded rate
- $3.03 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
