Metal form deck non-composite

$3.03 / SF

SS-D1-015 · MasterFormat 05 31 00 · SF

What’s in this rate

This unit covers Metal form deck non-composite, measured per square foot. The ironworker places and fastens non-composite metal form deck as a permanent form for concrete fill. The rate covers the listed material, 5.00% material waste, labor, and small tools. Composite floor deck, roof deck, pour stop, and slab concrete are separate units.

Includes

  • non-composite metal form deck
  • fastener share
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • metal-deck-floor-*-composite
  • metal-deck-roof-*
  • metal-deck-pour-stop
  • concrete fill / concrete-metal-pan-deck-fill
  • stair pan fill (concrete-stair-pan-fill)
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.016 hr × $58.00 wage and burden
$0.93
Material and small tools
$1.57
Direct rate (labor, material, and tools)
$2.50 / SF
Overhead 10% of direct
$0.25
Fee 10% of (direct and overhead)
$0.28
Loaded rate
$3.03 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.