Metal stud bridging channel
$10.60 / LF
DW-072 · MasterFormat 09 22 00 · LF
What’s in this rate
This unit is installing one linear foot of bridging channel for prepared metal-stud framing. The carpenter cuts, aligns, and fastens the channel to stabilize the stud run. Studs, track, kickers, backing, and engineering are separate units.
Includes
- bridging channel with 5% waste plus fasteners
- cut, align, and fasten channel
- small tools
Excludes
- metal studs
- track
- kickers
- backing
- deflection track
- engineering
- drywall hang
Build-up
- Labor 0.11 hr × $55.00 wage and burden
- $6.05
- Material and small tools
- $2.71
- Direct rate (labor, material, and tools)
- $8.76 / LF
- Overhead 10% of direct
- $0.88
- Fee 10% of (direct and overhead)
- $0.96
- Loaded rate
- $10.60 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
