Metal stud bridging channel

$10.60 / LF

DW-072 · MasterFormat 09 22 00 · LF

What’s in this rate

This unit is installing one linear foot of bridging channel for prepared metal-stud framing. The carpenter cuts, aligns, and fastens the channel to stabilize the stud run. Studs, track, kickers, backing, and engineering are separate units.

Includes

  • bridging channel with 5% waste plus fasteners
  • cut, align, and fasten channel
  • small tools

Excludes

  • metal studs
  • track
  • kickers
  • backing
  • deflection track
  • engineering
  • drywall hang

Build-up

Labor 0.11 hr × $55.00 wage and burden
$6.05
Material and small tools
$2.71
Direct rate (labor, material, and tools)
$8.76 / LF
Overhead 10% of direct
$0.88
Fee 10% of (direct and overhead)
$0.96
Loaded rate
$10.60 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.