1/2" mold-resistant hang

$5.65 / SF

DW-071 · MasterFormat 09 29 00 · SF

What’s in this rate

This unit is hanging one square foot of 1/2-inch mold-resistant gypsum board on prepared framing. The carpenter cuts, lifts, and screw-attaches the board. Framing, moisture detailing, insulation, and tape-and-finish are separate units.

Includes

  • 1/2-inch mold-resistant board with 10% waste
  • drywall screws
  • cut, hang, and screw to prepared framing
  • small tools

Excludes

  • framing
  • moisture detailing
  • insulation
  • tape and finish
  • waterproofing
  • sealant

Build-up

Labor 0.07 hr × $55.00 wage and burden
$3.85
Material and small tools
$0.82
Direct rate (labor, material, and tools)
$4.67 / SF
Overhead 10% of direct
$0.47
Fee 10% of (direct and overhead)
$0.51
Loaded rate
$5.65 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.