Metal stud chase wall

$14.35 / LF

DW-054 · MasterFormat 09 22 00 · LF

What’s in this rate

This unit is framing one linear foot of commercial metal stud chase wall, with track and studs amortized along the run. The carpenter cuts and fastens the chase framing ready for services and board. Services, drywall hang, soffit framing, and access panels are separate units.

Includes

  • chase-wall studs and track with 5% waste plus fasteners
  • fasteners
  • frame chase wall with track and studs
  • small tools

Excludes

  • mechanical/plumbing services; drywall hang; soffit framing; access panels; after-hours

Build-up

Labor 0.14 hr × $55.00 wage and burden
$7.70
Material and small tools
$4.16
Direct rate (labor, material, and tools)
$11.86 / LF
Overhead 10% of direct
$1.19
Fee 10% of (direct and overhead)
$1.30
Loaded rate
$14.35 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.