3/8" flexible board hang

$4.64 / SF

DW-053 · MasterFormat 09 29 00 · SF

What’s in this rate

This unit is hanging one square foot of 3/8-inch flexible gypsum board on prepared commercial framing. The carpenter cuts, bends, lifts, and screw-attaches the board. Radius framing, backing, finish, resilient channel, and acoustic sealant are separate units.

Includes

  • 3/8-inch flexible board with 10% waste
  • cut, bend, hang, and screw board
  • small tools

Excludes

  • radius framing; backing; board finish; resilient channel; acoustic sealant; after-hours

Build-up

Labor 0.06 hr × $55.00 wage and burden
$3.30
Material and small tools
$0.54
Direct rate (labor, material, and tools)
$3.84 / SF
Overhead 10% of direct
$0.38
Fee 10% of (direct and overhead)
$0.42
Loaded rate
$4.64 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.