Metal stud double track

$8.62 / LF

DW-026 · MasterFormat 09 22 00 · LF

What’s in this rate

This unit is installing one linear foot of double top or bottom track for deflection framing. The carpenter cuts and fastens nested or paired tracks at the head or sill. The rate is per linear foot of double track run. Single track, studs, and hang are separate units.

Includes

  • double track (two pieces) with 5% waste
  • fasteners
  • cut, nest/pair, and fasten
  • small tools

Excludes

  • metal studs / wall framing SF
  • single track only
  • drywall hang

Build-up

Labor 0.08 hr × $55.00 wage and burden
$4.40
Material and small tools
$2.73
Direct rate (labor, material, and tools)
$7.13 / LF
Overhead 10% of direct
$0.71
Fee 10% of (direct and overhead)
$0.78
Loaded rate
$8.62 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.