Drywall shadow bead

$8.02 / LF

DW-027 · MasterFormat 09 22 00 · LF

What’s in this rate

This unit is installing one linear foot of shadow-line reveal bead at a drywall edge or ceiling transition. The carpenter cuts and sets the shadow bead ready for finish coats. The rate is per linear foot of bead. J-bead, L-bead, corner bead, and tape-and-finish are separate units.

Includes

  • shadow-line reveal bead with 5% waste
  • fasteners / embed share
  • cut, set, and secure bead
  • small tools

Excludes

  • J-bead / L-bead (buy drywall-j-l-bead)
  • corner bead (buy corner-bead-install)
  • tape and finish beyond bead

Build-up

Labor 0.09 hr × $55.00 wage and burden
$4.95
Material and small tools
$1.68
Direct rate (labor, material, and tools)
$6.63 / LF
Overhead 10% of direct
$0.66
Fee 10% of (direct and overhead)
$0.73
Loaded rate
$8.02 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.