Open web steel joist K-series
$166.77 / EA
SS-018 · MasterFormat 05 21 00 · EA
What’s in this rate
This unit covers Open web steel joist K-series, measured per each. The ironworker sets and installs the K-series open-web steel joist on supporting steel. The rate covers the listed material, 5.00% material waste, labor, and small tools. LH-series joists, joist girder, bridging, joist seat weld, and paint-joist-* are separate units.
Includes
- K-series open-web steel joist delivery allocation
- seat hardware share
- layout and installation described above
- stated material waste and small tools
Excludes
- open-web-steel-joist-lh
- joist-girder-install
- joist-bridging-horizontal / diagonal
- joist-seat-weld
- paint-joist-* / paint-exposed-joist-spray
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.65 hr × $58.00 wage and burden
- $37.70
- Material and small tools
- $100.13
- Direct rate (labor, material, and tools)
- $137.83 / EA
- Overhead 10% of direct
- $13.78
- Fee 10% of (direct and overhead)
- $15.16
- Loaded rate
- $166.77 / EA
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
