CMU epoxy finish

$4.31 / SF

PT-143 · MasterFormat 09 91 00 · SF

What’s in this rate

This unit covers CMU epoxy finish, measured per square foot. The painter mixes the components, cuts in edges, and rolls epoxy to uniform coverage. The rate covers the listed material, 10.00% material waste, labor, and small tools. Block filler, crack repair, moisture mitigation, primer, specialty access, removals are separate units.

Includes

  • two-component epoxy finish coating for prepared CMU
  • layout, ordinary surface preparation, and coating application described above
  • stated material waste and small tools

Excludes

  • block filler
  • crack repair
  • moisture mitigation
  • primer
  • specialty access
  • removals
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.055 hr × $42.00 wage and burden
$2.31
Material and small tools
$1.25
Direct rate (labor, material, and tools)
$3.56 / SF
Overhead 10% of direct
$0.36
Fee 10% of (direct and overhead)
$0.39
Loaded rate
$4.31 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.