Conduit safety red

$2.77 / LF

PT-144 · MasterFormat 09 91 00 · LF

What’s in this rate

This unit covers Conduit safety red, measured per linear foot. The painter cleans the conduit, masks adjacent fittings and surfaces, applies red coating, and removes masking. The rate covers the listed material, 10.00% material waste, labor, and small tools. Conduit installation, labels, extensive corrosion removal, primer, access equipment, removals are separate units.

Includes

  • safety-red industrial coating for exposed conduit
  • layout, ordinary surface preparation, and coating application described above
  • stated material waste and small tools

Excludes

  • conduit installation
  • labels
  • extensive corrosion removal
  • primer
  • access equipment
  • removals
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.04 hr × $42.00 wage and burden
$1.68
Material and small tools
$0.61
Direct rate (labor, material, and tools)
$2.29 / LF
Overhead 10% of direct
$0.23
Fee 10% of (direct and overhead)
$0.25
Loaded rate
$2.77 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.