Band hanger sprinkler pipe

$30.83 / EA

FP-024 · MasterFormat 21 13 00 · EA

What’s in this rate

This unit covers Band hanger sprinkler pipe, measured per each. The sprinkler fitter installs the band or loop hanger and rod to structure and seats the FP pipe. The rate covers the listed material, 3.00% material waste, labor, and small tools. clevis hanger, trapeze, seismic brace, pipe LF are separate units.

Includes

  • band / loop hanger
  • rod and ordinary structure attachment share
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • clevis hanger
  • trapeze hanger
  • seismic brace
  • pipe (LF)
  • structural steel modifications
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.22 hr × $70.00 wage and burden
$15.40
Material and small tools
$10.08
Direct rate (labor, material, and tools)
$25.48 / EA
Overhead 10% of direct
$2.55
Fee 10% of (direct and overhead)
$2.80
Loaded rate
$30.83 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.