Trapeze hanger sprinkler

$124.26 / EA

FP-025 · MasterFormat 21 13 00 · EA

What’s in this rate

This unit covers Trapeze hanger sprinkler, measured per each. The sprinkler fitter fabricates or sets the trapeze, hangs rods to structure, levels the trapeze, and seats the FP main. The rate covers the listed material, 3.00% material waste, labor, and small tools. clevis hanger, band hanger, seismic brace, pipe LF are separate units.

Includes

  • trapeze hanger assembly (channel/angle and rods share)
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • clevis / band hangers as separate units
  • seismic brace
  • pipe (LF)
  • structural steel modifications
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.75 hr × $70.00 wage and burden
$52.50
Material and small tools
$50.19
Direct rate (labor, material, and tools)
$102.69 / EA
Overhead 10% of direct
$10.27
Fee 10% of (direct and overhead)
$11.30
Loaded rate
$124.26 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.