Steel C6 channel install

$12.59 / LF

SS-D2-009 · MasterFormat 05 12 00 · LF

What’s in this rate

This unit covers Steel C6 channel install, measured per linear foot. The ironworker erects and installs C6 structural steel channel. The rate covers the listed material, 5.00% material waste, labor, and small tools. Generic and MC channel, angles, WF beams, strut channel, and connections are separate units.

Includes

  • C6 channel delivery allocation
  • fasteners / bolt share
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • steel-channel-install (live generic) / steel-channel-mc12-install
  • strut-channel-* / hat-channel-furring
  • WF beams
  • field connections
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.07 hr × $58.00 wage and burden
$4.06
Material and small tools
$6.35
Direct rate (labor, material, and tools)
$10.41 / LF
Overhead 10% of direct
$1.04
Fee 10% of (direct and overhead)
$1.14
Loaded rate
$12.59 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.