Steel C6 channel install
$12.59 / LF
SS-D2-009 · MasterFormat 05 12 00 · LF
What’s in this rate
This unit covers Steel C6 channel install, measured per linear foot. The ironworker erects and installs C6 structural steel channel. The rate covers the listed material, 5.00% material waste, labor, and small tools. Generic and MC channel, angles, WF beams, strut channel, and connections are separate units.
Includes
- C6 channel delivery allocation
- fasteners / bolt share
- layout and installation described above
- stated material waste and small tools
Excludes
- steel-channel-install (live generic) / steel-channel-mc12-install
- strut-channel-* / hat-channel-furring
- WF beams
- field connections
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.07 hr × $58.00 wage and burden
- $4.06
- Material and small tools
- $6.35
- Direct rate (labor, material, and tools)
- $10.41 / LF
- Overhead 10% of direct
- $1.04
- Fee 10% of (direct and overhead)
- $1.14
- Loaded rate
- $12.59 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
