Steel lintel set in masonry

$17.05 / LF

MS-044 · MasterFormat 04 05 19 · LF

What’s in this rate

This unit covers Steel lintel set in masonry, measured per linear foot. The bricklayer sets a supplied steel angle or lintel in the masonry opening with bedding and alignment. The rate covers the listed material, 5.00% material waste, labor, and small tools. precast lintel set in masonry, CMU lintel block, Structural Steel lintel fab are separate units.

Includes

  • bricklayer handling and setting of supplied steel lintel/angle
  • bedding mortar / shims
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • steel lintel fab, galvanizing, and structural supply (Structural Steel pack)
  • precast lintel set
  • CMU lintel block
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.25 hr × $52.00 wage and burden
$13.00
Material and small tools
$1.09
Direct rate (labor, material, and tools)
$14.09 / LF
Overhead 10% of direct
$1.41
Fee 10% of (direct and overhead)
$1.55
Loaded rate
$17.05 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.