CMU lintel block

$30.28 / LF

MS-046 · MasterFormat 04 22 00 · LF

What’s in this rate

This unit covers CMU lintel block, measured per linear foot. The bricklayer sets a U-shaped CMU lintel block course over the opening ready for grout and rebar. The rate covers the listed material, 5.00% material waste, labor, and small tools. precast lintel set in masonry, steel lintel set in masonry, concrete-lintel-pour, masonry grout place are separate units.

Includes

  • U-shaped CMU lintel blocks
  • Type S mortar
  • layout over opening
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • concrete-lintel-pour
  • precast lintel set
  • steel lintel set
  • grout and rebar in lintel
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.28 hr × $52.00 wage and burden
$14.56
Material and small tools
$10.47
Direct rate (labor, material, and tools)
$25.03 / LF
Overhead 10% of direct
$2.50
Fee 10% of (direct and overhead)
$2.75
Loaded rate
$30.28 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.