CMU lintel block
$30.28 / LF
MS-046 · MasterFormat 04 22 00 · LF
What’s in this rate
This unit covers CMU lintel block, measured per linear foot. The bricklayer sets a U-shaped CMU lintel block course over the opening ready for grout and rebar. The rate covers the listed material, 5.00% material waste, labor, and small tools. precast lintel set in masonry, steel lintel set in masonry, concrete-lintel-pour, masonry grout place are separate units.
Includes
- U-shaped CMU lintel blocks
- Type S mortar
- layout over opening
- layout and installation described above
- stated material waste and small tools
Excludes
- concrete-lintel-pour
- precast lintel set
- steel lintel set
- grout and rebar in lintel
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.28 hr × $52.00 wage and burden
- $14.56
- Material and small tools
- $10.47
- Direct rate (labor, material, and tools)
- $25.03 / LF
- Overhead 10% of direct
- $2.50
- Fee 10% of (direct and overhead)
- $2.75
- Loaded rate
- $30.28 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
