Standard VCT install
$7.00 / SF
FL-159 · MasterFormat 09 65 00 · SF
What’s in this rate
This SF unit installs standard VCT over a prepared substrate; the crew lays out, spreads adhesive, cuts, sets, and rolls the tile. Through-color, conductive, static-control, static-dissipative, waxing, and substrate preparation are separate units.
Includes
- 1/8-inch standard vinyl composition tile
- VCT adhesive
- lay out, spread adhesive, cut, set, and roll
Excludes
- through-color VCT
- conductive or static-dissipative tile
- strip and wax
- moisture treatment
- substrate leveling
- after-hours work
Build-up
- Labor 0.075 hr × $55.00 wage and burden
- $4.12
- Material and small tools
- $1.66
- Direct rate (labor, material, and tools)
- $5.78 / SF
- Overhead 10% of direct
- $0.58
- Fee 10% of (direct and overhead)
- $0.64
- Loaded rate
- $7.00 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
