Header-bond brick
$20.19 / SF
MS-D3-014 · MasterFormat 04 21 13 · SF
What’s in this rate
This unit covers Header-bond brick, measured per square foot. The bricklayer lays header-bond pattern face brick with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. brick header course, english bond, flemish bond, common bond are separate units.
Includes
- clay brick units as specified
- Type S mortar allocation
- bed and head joints with tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- brick-header-course
- english / flemish / common bond
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.19 hr × $52.00 wage and burden
- $9.88
- Material and small tools
- $6.80
- Direct rate (labor, material, and tools)
- $16.68 / SF
- Overhead 10% of direct
- $1.67
- Fee 10% of (direct and overhead)
- $1.84
- Loaded rate
- $20.19 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
