Common-bond brick

$18.28 / SF

MS-D3-015 · MasterFormat 04 21 13 · SF

What’s in this rate

This unit covers Common-bond brick, measured per square foot. The bricklayer lays common-bond pattern face brick with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. english bond, flemish bond, stack-bond veneer, running-bond veneer are separate units.

Includes

  • clay brick units as specified
  • Type S mortar allocation
  • bed and head joints with tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • english / flemish / stack bond
  • running-bond field veneer
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.17 hr × $52.00 wage and burden
$8.84
Material and small tools
$6.27
Direct rate (labor, material, and tools)
$15.11 / SF
Overhead 10% of direct
$1.51
Fee 10% of (direct and overhead)
$1.66
Loaded rate
$18.28 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.