Mortar joint tooling
$2.69 / LF
MS-027 · MasterFormat 04 05 13 · LF
What’s in this rate
This unit covers Mortar joint tooling, measured per linear foot. The bricklayer tools fresh mortar joints to the specified concave, V, or weathered profile. The rate covers the listed material, 2.00% material waste, labor, and small tools. tuckpoint masonry, brick veneer, CMU wall lay are separate units.
Includes
- tooling of fresh mortar joints to specified profile
- layout and installation described above
- stated material waste and small tools
Excludes
- tuckpoint of existing masonry
- new brick/CMU lay
- sack rub / parging
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.04 hr × $52.00 wage and burden
- $2.08
- Material and small tools
- $0.15
- Direct rate (labor, material, and tools)
- $2.23 / LF
- Overhead 10% of direct
- $0.22
- Fee 10% of (direct and overhead)
- $0.24
- Loaded rate
- $2.69 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
