Tuckpoint masonry

$31.98 / SF

MS-028 · MasterFormat 04 01 20 · SF

What’s in this rate

This unit covers Tuckpoint masonry, measured per square foot. The bricklayer cuts out deteriorated mortar joints and tuckpoints with matching mortar, then tools the face. The rate covers the listed material, 5.00% material waste, labor, and small tools. mortar joint tooling, sack rub CMU, masonry parging, new brick/CMU lay are separate units.

Includes

  • cut-out of deteriorated joints as scoped
  • tuckpoint mortar placement and tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • new masonry lay
  • sack rub CMU
  • masonry parging
  • full facade restoration beyond tuckpoint
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.45 hr × $52.00 wage and burden
$23.40
Material and small tools
$3.03
Direct rate (labor, material, and tools)
$26.43 / SF
Overhead 10% of direct
$2.64
Fee 10% of (direct and overhead)
$2.91
Loaded rate
$31.98 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.