Brick soldier lintel course

$41.95 / LF

MS-D-034 · MasterFormat 04 21 00 · LF

What’s in this rate

This unit covers Brick soldier lintel course, measured per linear foot. The bricklayer sets a soldier-course brick band over the opening as the lintel face with aligned joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. brick soldier course (band), steel lintel set in masonry, precast lintel set in masonry, concrete-lintel-pour are separate units.

Includes

  • soldier-oriented face brick over opening as lintel face
  • mortar allocation
  • layout and tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • brick-soldier-course band (non-lintel)
  • steel-lintel-masonry-set
  • precast-lintel-masonry-set
  • concrete-lintel-pour
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.45 hr × $52.00 wage and burden
$23.40
Material and small tools
$11.27
Direct rate (labor, material, and tools)
$34.67 / LF
Overhead 10% of direct
$3.47
Fee 10% of (direct and overhead)
$3.81
Loaded rate
$41.95 / LF