Brick soldier lintel course
$41.95 / LF
MS-D-034 · MasterFormat 04 21 00 · LF
What’s in this rate
This unit covers Brick soldier lintel course, measured per linear foot. The bricklayer sets a soldier-course brick band over the opening as the lintel face with aligned joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. brick soldier course (band), steel lintel set in masonry, precast lintel set in masonry, concrete-lintel-pour are separate units.
Includes
- soldier-oriented face brick over opening as lintel face
- mortar allocation
- layout and tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- brick-soldier-course band (non-lintel)
- steel-lintel-masonry-set
- precast-lintel-masonry-set
- concrete-lintel-pour
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.45 hr × $52.00 wage and burden
- $23.40
- Material and small tools
- $11.27
- Direct rate (labor, material, and tools)
- $34.67 / LF
- Overhead 10% of direct
- $3.47
- Fee 10% of (direct and overhead)
- $3.81
- Loaded rate
- $41.95 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.