Brick string course
$29.65 / LF
MS-D3-017 · MasterFormat 04 21 13 · LF
What’s in this rate
This unit covers Brick string course, measured per linear foot. The bricklayer sets a brick string course band with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. brick water table, brick cornice, brick rowlock course, cast-stone banding are separate units.
Includes
- clay brick units as specified
- Type S mortar allocation
- bed and head joints with tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- brick-water-table
- brick cornice
- cast-stone banding
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.3 hr × $52.00 wage and burden
- $15.60
- Material and small tools
- $8.90
- Direct rate (labor, material, and tools)
- $24.50 / LF
- Overhead 10% of direct
- $2.45
- Fee 10% of (direct and overhead)
- $2.70
- Loaded rate
- $29.65 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
