Brick string course

$29.65 / LF

MS-D3-017 · MasterFormat 04 21 13 · LF

What’s in this rate

This unit covers Brick string course, measured per linear foot. The bricklayer sets a brick string course band with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. brick water table, brick cornice, brick rowlock course, cast-stone banding are separate units.

Includes

  • clay brick units as specified
  • Type S mortar allocation
  • bed and head joints with tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • brick-water-table
  • brick cornice
  • cast-stone banding
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.3 hr × $52.00 wage and burden
$15.60
Material and small tools
$8.90
Direct rate (labor, material, and tools)
$24.50 / LF
Overhead 10% of direct
$2.45
Fee 10% of (direct and overhead)
$2.70
Loaded rate
$29.65 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.