Brick soldier band
$34.45 / LF
MS-D3-016 · MasterFormat 04 21 13 · LF
What’s in this rate
This unit covers Brick soldier band, measured per linear foot. The bricklayer sets a horizontal soldier-band course with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. brick soldier course, brick soldier lintel, brick sailor course are separate units.
Includes
- clay brick units as specified
- Type S mortar allocation
- bed and head joints with tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- brick-soldier-course
- brick-soldier-lintel
- sailor course
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.36 hr × $52.00 wage and burden
- $18.72
- Material and small tools
- $9.75
- Direct rate (labor, material, and tools)
- $28.47 / LF
- Overhead 10% of direct
- $2.85
- Fee 10% of (direct and overhead)
- $3.13
- Loaded rate
- $34.45 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
