Brick soldier band

$34.45 / LF

MS-D3-016 · MasterFormat 04 21 13 · LF

What’s in this rate

This unit covers Brick soldier band, measured per linear foot. The bricklayer sets a horizontal soldier-band course with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. brick soldier course, brick soldier lintel, brick sailor course are separate units.

Includes

  • clay brick units as specified
  • Type S mortar allocation
  • bed and head joints with tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • brick-soldier-course
  • brick-soldier-lintel
  • sailor course
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.36 hr × $52.00 wage and burden
$18.72
Material and small tools
$9.75
Direct rate (labor, material, and tools)
$28.47 / LF
Overhead 10% of direct
$2.85
Fee 10% of (direct and overhead)
$3.13
Loaded rate
$34.45 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.