Below-grade CMU wall

$16.40 / SF

MS-D2-007 · MasterFormat 04 22 00 · SF

What’s in this rate

This unit covers Below-grade CMU wall, measured per square foot. The bricklayer lays below-grade CMU wall with tooled joints to the specified height. The rate covers the listed material, 5.00% material waste, labor, and small tools. excavation / earthwork, waterproofing / dampproofing, CIP foundation wall, field above-grade CMU are separate units.

Includes

  • below-grade cmu wall units / block
  • Type S mortar allocation
  • bed and head joints with tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • excavation / earthwork
  • waterproofing / dampproofing
  • CIP foundation wall
  • grout / rebar
  • paint-cmu-*
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.15 hr × $52.00 wage and burden
$7.80
Material and small tools
$5.75
Direct rate (labor, material, and tools)
$13.55 / SF
Overhead 10% of direct
$1.36
Fee 10% of (direct and overhead)
$1.49
Loaded rate
$16.40 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.