CMU corner return

$30.14 / LF

MS-D3-004 · MasterFormat 04 22 00 · LF

What’s in this rate

This unit covers CMU corner return, measured per linear foot. The bricklayer lays CMU corner return / return leg with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. CMU bullnose corner, CMU pilaster, field CMU wall are separate units.

Includes

  • CMU units / block as specified
  • Type S mortar allocation
  • bed and head joints with tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • cmu-bullnose-corner
  • field CMU wall
  • pilaster
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.32 hr × $52.00 wage and burden
$16.64
Material and small tools
$8.27
Direct rate (labor, material, and tools)
$24.91 / LF
Overhead 10% of direct
$2.49
Fee 10% of (direct and overhead)
$2.74
Loaded rate
$30.14 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.