Fire-rated CMU wall

$17.15 / SF

MS-D2-002 · MasterFormat 04 22 00 · SF

What’s in this rate

This unit covers Fire-rated CMU wall, measured per square foot. The bricklayer lays fire-rated CMU to the specified assembly with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. field CMU wall, paint-cmu finishes, insulated CMU wall, acoustic CMU wall are separate units.

Includes

  • fire-rated cmu wall units / block
  • Type S mortar allocation
  • bed and head joints with tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • field CMU wall
  • paint-cmu-*
  • firestopping / rated door hardware
  • grout / rebar
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.14 hr × $52.00 wage and burden
$7.28
Material and small tools
$6.89
Direct rate (labor, material, and tools)
$14.17 / SF
Overhead 10% of direct
$1.42
Fee 10% of (direct and overhead)
$1.56
Loaded rate
$17.15 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.