Loadbearing CMU wall

$14.74 / SF

MS-D2-003 · MasterFormat 04 22 00 · SF

What’s in this rate

This unit covers Loadbearing CMU wall, measured per square foot. The bricklayer lays loadbearing CMU in running bond with tooled mortar joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. nonloadbearing CMU partition, CMU backup wall, grout-filled CMU cell, vertical rebar in CMU are separate units.

Includes

  • loadbearing cmu wall units / block
  • Type S mortar allocation
  • bed and head joints with tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • nonloadbearing CMU partition
  • grout / rebar
  • paint-cmu-*
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.13 hr × $52.00 wage and burden
$6.76
Material and small tools
$5.42
Direct rate (labor, material, and tools)
$12.18 / SF
Overhead 10% of direct
$1.22
Fee 10% of (direct and overhead)
$1.34
Loaded rate
$14.74 / SF