Nonloadbearing CMU partition
$11.81 / SF
MS-D2-004 · MasterFormat 04 22 00 · SF
What’s in this rate
This unit covers Nonloadbearing CMU partition, measured per square foot. The bricklayer lays nonloadbearing CMU partition with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. loadbearing CMU wall, drywall partition, paint-cmu finishes are separate units.
Includes
- nonloadbearing cmu partition units / block
- Type S mortar allocation
- bed and head joints with tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- loadbearing CMU wall
- drywall partition
- paint-cmu-*
- grout / rebar
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.11 hr × $52.00 wage and burden
- $5.72
- Material and small tools
- $4.04
- Direct rate (labor, material, and tools)
- $9.76 / SF
- Overhead 10% of direct
- $0.98
- Fee 10% of (direct and overhead)
- $1.07
- Loaded rate
- $11.81 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
