Nonloadbearing CMU partition

$11.81 / SF

MS-D2-004 · MasterFormat 04 22 00 · SF

What’s in this rate

This unit covers Nonloadbearing CMU partition, measured per square foot. The bricklayer lays nonloadbearing CMU partition with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. loadbearing CMU wall, drywall partition, paint-cmu finishes are separate units.

Includes

  • nonloadbearing cmu partition units / block
  • Type S mortar allocation
  • bed and head joints with tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • loadbearing CMU wall
  • drywall partition
  • paint-cmu-*
  • grout / rebar
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.11 hr × $52.00 wage and burden
$5.72
Material and small tools
$4.04
Direct rate (labor, material, and tools)
$9.76 / SF
Overhead 10% of direct
$0.98
Fee 10% of (direct and overhead)
$1.07
Loaded rate
$11.81 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.