Horizontal rebar in CMU
$6.15 / LF
MS-D-006 · MasterFormat 04 22 00 · LF
What’s in this rate
This unit covers Horizontal rebar in CMU, measured per linear foot. The bricklayer places horizontal reinforcing bars in bond-beam or lintel cells and holds position for grouting. The rate covers the listed material, 3.00% material waste, labor, and small tools. vertical rebar in CMU, slab rebar-install-*, CMU bond beam block course, masonry grout place are separate units.
Includes
- horizontal rebar cut/place in bond-beam/lintel cells
- positioners / spacers allocation as scoped
- layout and installation described above
- stated material waste and small tools
Excludes
- cmu-vertical-rebar
- slab rebar-install-*
- grout fill
- CMU wall lay
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.06 hr × $52.00 wage and burden
- $3.12
- Material and small tools
- $1.96
- Direct rate (labor, material, and tools)
- $5.08 / LF
- Overhead 10% of direct
- $0.51
- Fee 10% of (direct and overhead)
- $0.56
- Loaded rate
- $6.15 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
