Horizontal rebar in CMU

$6.15 / LF

MS-D-006 · MasterFormat 04 22 00 · LF

What’s in this rate

This unit covers Horizontal rebar in CMU, measured per linear foot. The bricklayer places horizontal reinforcing bars in bond-beam or lintel cells and holds position for grouting. The rate covers the listed material, 3.00% material waste, labor, and small tools. vertical rebar in CMU, slab rebar-install-*, CMU bond beam block course, masonry grout place are separate units.

Includes

  • horizontal rebar cut/place in bond-beam/lintel cells
  • positioners / spacers allocation as scoped
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • cmu-vertical-rebar
  • slab rebar-install-*
  • grout fill
  • CMU wall lay
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.06 hr × $52.00 wage and burden
$3.12
Material and small tools
$1.96
Direct rate (labor, material, and tools)
$5.08 / LF
Overhead 10% of direct
$0.51
Fee 10% of (direct and overhead)
$0.56
Loaded rate
$6.15 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.