Solid-grouted CMU wall

$18.85 / SF

MS-D-005 · MasterFormat 04 22 00 · SF

What’s in this rate

This unit covers Solid-grouted CMU wall, measured per square foot. The bricklayer places masonry grout to solid-fill the CMU wall area and consolidates as scoped. The rate covers the listed material, 3.00% material waste, labor, and small tools. grout-filled CMU cell, masonry grout place (CF), concrete-nonshrink-grout, concrete-bond-beam are separate units.

Includes

  • masonry grout for solid wall-area fill
  • placement and consolidation per SF of wall
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • single-cell cmu-grout-filled-cell
  • masonry-grout-place by CF
  • concrete-nonshrink-grout
  • concrete-bond-beam
  • CMU wall lay
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.18 hr × $52.00 wage and burden
$9.36
Material and small tools
$6.22
Direct rate (labor, material, and tools)
$15.58 / SF
Overhead 10% of direct
$1.56
Fee 10% of (direct and overhead)
$1.71
Loaded rate
$18.85 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.