CMU weep

$7.38 / EA

MS-013 · MasterFormat 04 22 00 · EA

What’s in this rate

This unit covers CMU weep, measured per each. The bricklayer installs a weep hole, tube, or vent at the CMU cavity flashing line. The rate covers the listed material, 5.00% material waste, labor, and small tools. through-wall flashing masonry, mortar net cavity, drip edge masonry are separate units.

Includes

  • weep tube / vent / open-head weep as scoped
  • placement at flashing line
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • through-wall flashing
  • mortar net
  • cavity drainage mat
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.08 hr × $52.00 wage and burden
$4.16
Material and small tools
$1.94
Direct rate (labor, material, and tools)
$6.10 / EA
Overhead 10% of direct
$0.61
Fee 10% of (direct and overhead)
$0.67
Loaded rate
$7.38 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.