CMU knee wall
$15.10 / SF
MS-D3-010 · MasterFormat 04 22 00 · SF
What’s in this rate
This unit covers CMU knee wall, measured per square foot. The bricklayer lays low CMU knee wall with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. half-high CMU partition, CMU parapet wall, CMU curb / equipment pad are separate units.
Includes
- CMU units / block as specified
- Type S mortar allocation
- bed and head joints with tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- cmu-half-high-partition
- cmu-parapet-wall
- equipment pad pour
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.14 hr × $52.00 wage and burden
- $7.28
- Material and small tools
- $5.20
- Direct rate (labor, material, and tools)
- $12.48 / SF
- Overhead 10% of direct
- $1.25
- Fee 10% of (direct and overhead)
- $1.37
- Loaded rate
- $15.10 / SF