Grout-filled CMU cell

$14.17 / EA

MS-010 · MasterFormat 04 22 00 · EA

What’s in this rate

This unit covers Grout-filled CMU cell, measured per each. The bricklayer places masonry grout into one cleaned CMU cell and consolidates as scoped. The rate covers the listed material, 3.00% material waste, labor, and small tools. masonry grout place (CF), CMU wall lay, vertical rebar in CMU, concrete-nonshrink-grout are separate units.

Includes

  • masonry grout for one cell
  • placement into cleaned cell
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • CMU wall lay
  • vertical rebar (separate)
  • full-height masonry-grout-place by CF
  • concrete nonshrink grout
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.15 hr × $52.00 wage and burden
$7.80
Material and small tools
$3.91
Direct rate (labor, material, and tools)
$11.71 / EA
Overhead 10% of direct
$1.17
Fee 10% of (direct and overhead)
$1.29
Loaded rate
$14.17 / EA