CMU bond beam block course
$27.03 / LF
MS-009 · MasterFormat 04 22 00 · LF
What’s in this rate
This unit covers CMU bond beam block course, measured per linear foot. The bricklayer sets a CMU bond-beam block course with open cells ready for grout and rebar. The rate covers the listed material, 5.00% material waste, labor, and small tools. concrete-bond-beam (CIP), masonry grout place, vertical rebar in CMU, CMU lintel block are separate units.
Includes
- bond-beam CMU units
- Type S mortar for course
- setting of bond-beam course
- layout and installation described above
- stated material waste and small tools
Excludes
- cast-in-place concrete bond beam (concrete-bond-beam)
- grout placement (masonry-grout-place)
- horizontal rebar placement
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.25 hr × $52.00 wage and burden
- $13.00
- Material and small tools
- $9.34
- Direct rate (labor, material, and tools)
- $22.34 / LF
- Overhead 10% of direct
- $2.23
- Fee 10% of (direct and overhead)
- $2.46
- Loaded rate
- $27.03 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
