CMU bond beam block course

$27.03 / LF

MS-009 · MasterFormat 04 22 00 · LF

What’s in this rate

This unit covers CMU bond beam block course, measured per linear foot. The bricklayer sets a CMU bond-beam block course with open cells ready for grout and rebar. The rate covers the listed material, 5.00% material waste, labor, and small tools. concrete-bond-beam (CIP), masonry grout place, vertical rebar in CMU, CMU lintel block are separate units.

Includes

  • bond-beam CMU units
  • Type S mortar for course
  • setting of bond-beam course
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • cast-in-place concrete bond beam (concrete-bond-beam)
  • grout placement (masonry-grout-place)
  • horizontal rebar placement
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.25 hr × $52.00 wage and burden
$13.00
Material and small tools
$9.34
Direct rate (labor, material, and tools)
$22.34 / LF
Overhead 10% of direct
$2.23
Fee 10% of (direct and overhead)
$2.46
Loaded rate
$27.03 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.