Bond beam place
$9.03 / LF
CN-087 · MasterFormat 03 30 00 · LF
What’s in this rate
This unit is placing one linear foot of concrete bond beam fill at a prepared commercial masonry course. The cement mason places and finishes the fill ready for cure. Masonry, reinforcing steel, lintels, and grade beams are separate units.
Includes
- bond-beam concrete/grout with 5% waste
- place and finish bond beam fill
- small tools
Excludes
- CMU installation; reinforcing steel; lintel; grade beam; scaffolding; after-hours
Build-up
- Labor 0.1 hr × $48.00 wage and burden
- $4.80
- Material and small tools
- $2.66
- Direct rate (labor, material, and tools)
- $7.46 / LF
- Overhead 10% of direct
- $0.75
- Fee 10% of (direct and overhead)
- $0.82
- Loaded rate
- $9.03 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
