Channel drain place
$19.47 / LF
CN-171 · MasterFormat 03 30 00 · LF
What’s in this rate
This unit is placing one linear foot of concrete encasement for a prepared channel-drain assembly. The cement mason places and consolidates the encasement around the set channel. Excavation, the drain channel, grate, frame, and piping connections are separate units.
Includes
- ready-mix concrete encasement
- form and release-agent allowance
- place and consolidate channel-drain encasement
- small tools
Excludes
- excavation
- prefabricated drain channel
- grate and frame
- piping connection
- waterproofing
- testing
Build-up
- Labor 0.2 hr × $48.00 wage and burden
- $9.60
- Material and small tools
- $6.49
- Direct rate (labor, material, and tools)
- $16.09 / LF
- Overhead 10% of direct
- $1.61
- Fee 10% of (direct and overhead)
- $1.77
- Loaded rate
- $19.47 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
