Channel drain place

$19.47 / LF

CN-171 · MasterFormat 03 30 00 · LF

What’s in this rate

This unit is placing one linear foot of concrete encasement for a prepared channel-drain assembly. The cement mason places and consolidates the encasement around the set channel. Excavation, the drain channel, grate, frame, and piping connections are separate units.

Includes

  • ready-mix concrete encasement
  • form and release-agent allowance
  • place and consolidate channel-drain encasement
  • small tools

Excludes

  • excavation
  • prefabricated drain channel
  • grate and frame
  • piping connection
  • waterproofing
  • testing

Build-up

Labor 0.2 hr × $48.00 wage and burden
$9.60
Material and small tools
$6.49
Direct rate (labor, material, and tools)
$16.09 / LF
Overhead 10% of direct
$1.61
Fee 10% of (direct and overhead)
$1.77
Loaded rate
$19.47 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.