Mat foundation pour
$24.95 / CF
CN-170 · MasterFormat 03 30 00 · CF
What’s in this rate
This unit is placing one cubic foot of concrete into a prepared mat-foundation pour. The cement mason places, consolidates, and finishes the mat mass. Excavation, formwork, reinforcing steel, waterproofing, and testing are separate units.
Includes
- ready-mix concrete
- curing-material allowance
- place, consolidate, and finish mat foundation
- small tools
Excludes
- excavation
- formwork
- reinforcing steel
- waterproofing
- pump mobilization
- testing
Build-up
- Labor 0.255 hr × $48.00 wage and burden
- $12.24
- Material and small tools
- $8.38
- Direct rate (labor, material, and tools)
- $20.62 / CF
- Overhead 10% of direct
- $2.06
- Fee 10% of (direct and overhead)
- $2.27
- Loaded rate
- $24.95 / CF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
