Hexagon column form
$22.65 / LF
CN-218 · MasterFormat 03 11 00 · LF
What’s in this rate
This unit is setting one linear foot of reusable hexagon concrete column form at a prepared column line. The cement mason assembles, plumbs, braces, and strips the hexagon form. Concrete placement, reinforcement, liners, and engineered shoring are separate units.
Includes
- reusable hexagon column-form allowance
- ties, clamps, and release agent
- set, plumb, brace, and strip hexagon form
- small tools
Excludes
- concrete placement
- reinforcing steel
- architectural form liner
- engineered shoring
- octagon column form
- embeds
Build-up
- Labor 0.25 hr × $48.00 wage and burden
- $12.00
- Material and small tools
- $6.72
- Direct rate (labor, material, and tools)
- $18.72 / LF
- Overhead 10% of direct
- $1.87
- Fee 10% of (direct and overhead)
- $2.06
- Loaded rate
- $22.65 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
