Column pier pour
$29.23 / CF
CN-130 · MasterFormat 03 30 00 · CF
What’s in this rate
This unit is placing one cubic foot of cast-in-place concrete column pier at prepared forms. The cement mason places, consolidates, and finishes the pier profile.
Includes
- column-pier concrete with 5% waste
- place, consolidate, and finish pier
- small tools
Excludes
- footing
- rebar
- embeds
- full form system
- shoring
- engineering
- testing
Build-up
- Labor 0.3 hr × $48.00 wage and burden
- $14.40
- Material and small tools
- $9.75
- Direct rate (labor, material, and tools)
- $24.15 / CF
- Overhead 10% of direct
- $2.42
- Fee 10% of (direct and overhead)
- $2.66
- Loaded rate
- $29.23 / CF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
