Column pier pour

$29.23 / CF

CN-130 · MasterFormat 03 30 00 · CF

What’s in this rate

This unit is placing one cubic foot of cast-in-place concrete column pier at prepared forms. The cement mason places, consolidates, and finishes the pier profile.

Includes

  • column-pier concrete with 5% waste
  • place, consolidate, and finish pier
  • small tools

Excludes

  • footing
  • rebar
  • embeds
  • full form system
  • shoring
  • engineering
  • testing

Build-up

Labor 0.3 hr × $48.00 wage and burden
$14.40
Material and small tools
$9.75
Direct rate (labor, material, and tools)
$24.15 / CF
Overhead 10% of direct
$2.42
Fee 10% of (direct and overhead)
$2.66
Loaded rate
$29.23 / CF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.