Strip footing

$24.47 / CF

CN-129 · MasterFormat 03 31 00 · CF

What’s in this rate

This unit is placing one cubic foot of strip-footing concrete at a prepared commercial foundation. The cement mason places, consolidates, and finishes the footing mass.

Includes

  • ready-mix concrete with 5% waste
  • place, consolidate, and finish strip footing
  • small tools

Excludes

  • excavation
  • subgrade
  • rebar
  • full formwork
  • anchors
  • backfill
  • testing
  • pump mobilization

Build-up

Labor 0.26 hr × $48.00 wage and burden
$12.48
Material and small tools
$7.75
Direct rate (labor, material, and tools)
$20.23 / CF
Overhead 10% of direct
$2.02
Fee 10% of (direct and overhead)
$2.22
Loaded rate
$24.47 / CF