Rolled curb

$19.60 / LF

CN-148 · MasterFormat 03 30 00 · LF

What’s in this rate

This unit is forming, placing, and finishing one linear foot of rolled concrete curb on prepared base. The cement mason shapes and finishes the rolled profile. Base, gutter, sidewalk, reinforcement, sawcuts, and testing are separate units.

Includes

  • curb concrete
  • profile-form and release-agent allowance
  • form, place, and finish rolled profile
  • small tools

Excludes

  • subgrade and base
  • gutter
  • sidewalk
  • reinforcing steel
  • sawcuts
  • curing compound
  • testing

Build-up

Labor 0.205 hr × $48.00 wage and burden
$9.84
Material and small tools
$6.36
Direct rate (labor, material, and tools)
$16.20 / LF
Overhead 10% of direct
$1.62
Fee 10% of (direct and overhead)
$1.78
Loaded rate
$19.60 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.