Dock wall form
$19.50 / LF
CN-149 · MasterFormat 03 11 00 · LF
What’s in this rate
This unit is setting one linear foot of loading-dock wall form at a prepared dock line. The cement mason aligns, braces, and strips the form. Concrete placement, reinforcement, dock equipment, embeds, and engineered shoring are separate units.
Includes
- reusable plywood and lumber allowance
- ties, braces, and release agent
- set, plumb, brace, and strip dock wall form
- small tools
Excludes
- concrete placement
- reinforcing steel
- dock equipment
- embeds and angles
- engineered shoring
- waterproofing
Build-up
- Labor 0.22 hr × $48.00 wage and burden
- $10.56
- Material and small tools
- $5.56
- Direct rate (labor, material, and tools)
- $16.12 / LF
- Overhead 10% of direct
- $1.61
- Fee 10% of (direct and overhead)
- $1.77
- Loaded rate
- $19.50 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
