Dock pit wall form
$16.67 / SF
CN-209 · MasterFormat 03 30 00 · SF
What’s in this rate
This unit is forming one square foot of dock-pit wall face at a prepared pit line. The cement mason cuts, aligns, braces, and strips forms for the dock-pit wall. Pit pour, apron pour, reinforcing steel, embeds, and leveler equipment are separate units.
Includes
- reusable form-face and lumber allowance
- ties, braces, and fasteners
- cut, align, brace, and strip dock-pit wall form
- small tools
Excludes
- dock leveler pit pour
- apron pour
- reinforcing steel
- embeds
- leveler equipment
- excavation
Build-up
- Labor 0.2 hr × $48.00 wage and burden
- $9.60
- Material and small tools
- $4.17
- Direct rate (labor, material, and tools)
- $13.77 / SF
- Overhead 10% of direct
- $1.38
- Fee 10% of (direct and overhead)
- $1.52
- Loaded rate
- $16.67 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
