Dock wall pour

$19.19 / SF

CN-122 · MasterFormat 03 30 00 · SF

What’s in this rate

This unit is placing one square foot of concrete wall at a prepared commercial loading dock. The cement mason places, consolidates, and finishes the dock wall face ready for cure. Rebar, excavation, waterproofing, and dock equipment are separate units.

Includes

  • ready-mix for dock wall with 5% waste and form share
  • place, consolidate, and finish wall face
  • small tools

Excludes

  • excavation
  • shoring
  • rebar
  • embeds
  • waterproofing
  • dock equipment
  • pumping

Build-up

Labor 0.18 hr × $48.00 wage and burden
$8.64
Material and small tools
$7.22
Direct rate (labor, material, and tools)
$15.86 / SF
Overhead 10% of direct
$1.59
Fee 10% of (direct and overhead)
$1.74
Loaded rate
$19.19 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.