Dowel basket at construction joint

$15.52 / LF

CN-023 · MasterFormat 03 15 00 · LF

What’s in this rate

This unit is setting one linear foot of dowel basket at a slab construction joint. The mason aligns the basket and leaves it ready for concrete. The rate is per linear foot. Concrete place, sawcut, and joint sealant are separate units.

Includes

  • Dowel basket assembly
  • Set and align at the construction joint
  • Small tools

Excludes

  • Concrete place
  • Sawcut
  • Joint sealant

Build-up

Labor 0.08 hr × $48.00 wage and burden
$3.84
Material and small tools
$8.99
Direct rate (labor, material, and tools)
$12.83 / LF
Overhead 10% of direct
$1.28
Fee 10% of (direct and overhead)
$1.41
Loaded rate
$15.52 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.