Keyway construction joint form
$8.11 / LF
CN-028 · MasterFormat 03 11 00 · LF
What’s in this rate
This unit is setting and stripping one linear foot of keyway form at a construction joint. The mason places the keyway strip and leaves the joint ready for the next pour. The rate is per linear foot. A dowel basket, joint sealant, and concrete place are separate units.
Includes
- Keyway form strip
- Set and strip at the construction joint
- Small tools
Excludes
- Dowel basket
- Joint sealant
- Concrete place
Build-up
- Labor 0.1 hr × $48.00 wage and burden
- $4.80
- Material and small tools
- $1.90
- Direct rate (labor, material, and tools)
- $6.70 / LF
- Overhead 10% of direct
- $0.67
- Fee 10% of (direct and overhead)
- $0.74
- Loaded rate
- $8.11 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
