Keyway construction joint form

$8.11 / LF

CN-028 · MasterFormat 03 11 00 · LF

What’s in this rate

This unit is setting and stripping one linear foot of keyway form at a construction joint. The mason places the keyway strip and leaves the joint ready for the next pour. The rate is per linear foot. A dowel basket, joint sealant, and concrete place are separate units.

Includes

  • Keyway form strip
  • Set and strip at the construction joint
  • Small tools

Excludes

  • Dowel basket
  • Joint sealant
  • Concrete place

Build-up

Labor 0.1 hr × $48.00 wage and burden
$4.80
Material and small tools
$1.90
Direct rate (labor, material, and tools)
$6.70 / LF
Overhead 10% of direct
$0.67
Fee 10% of (direct and overhead)
$0.74
Loaded rate
$8.11 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.